ESKENE WEST RAIL/ AKCO

 

EWRP

The Rail Loading Facility provides for the export of up to 4,500 tons of sulphur pastilles per day. It becomes an integral part of a network of railway tracks and sidings to support the requirements of trains used in the Oil Project Facility including the receipt, storage and dispatch of rail cars. It also acts as a buffer between the Oil Project Facility and the Kazakhstan rail network for both incoming and outgoing trains to facilitate the handover of the trains between AKCO and Kazakhstan National Railways .The EWRP project provides for the design of numerous Sulphur Facilities and auxiliaries.

 

SPB FS-Piperack Admin-CCR SS61-U&I-Piperack

 

firestation 4 pastillation building 2    bulk load out tower

 

 

Powered by Google Talk Widget